Bridge
Riverfront Flyover
2.4 km six-lane flyover over the river corridor
A 2.4 km elevated corridor with precast PSC girders that cut cross-city travel time by 40%.
Key achievements
- Completed 4 months ahead of schedule
- Zero lost-time injuries
- 40% reduction in travel time